Job completed for Jetting Fouled Drain Lines in Harrison, NY

Completion date: September 21, 2021

Completion date: September 21, 2021

About this project:

The catch basin seen in the photo was full of leaves, silts and debris and had frozen over from the temperatures. As a result, new water introduced into the basin would fill and spill over into the driveway, leaving a huge puddle. We cleared out all the debris and restored the catch basin’s function. No more puddles!

Before Photos:

After Photos: